Template · EV chargers
EV charger site survey checklist: what to ask before booking the electrician
Home and commercial EV charger installations are high-volume, tight-margin jobs. One abortive visit because the landlord never approved the charger, the meter cabinet has no room for protection gear, or the cable route requires core drilling through two concrete walls wipes out the margin. A short customer self-survey before you schedule the electrician catches those blockers upfront.
Updated November 20, 2026Why EV charger jobs need a pre-installation survey
Most EV charger quotes assume a standard cable run and an accessible distribution board. Without two clear photos and a written consent check from the customer, the electrician only discovers missing permissions or an overloaded board on installation morning.
This checklist does not replace electrical load calculations or grid-operator notifications — it gives your office verified site facts before you assign a van and installation slot.
EV charger site survey questions and blockers
The table below mirrors InstallCue’s ready-to-use Wallbox / EV charger starter template. Column three lists the conditions that automatically mark a site Blocked until resolved.
| Question to the customer | Ask for | Stops the job when |
|---|---|---|
| Where should the charger be mounted? | Garage, carport, outside wall of the house, underground car park, or other | Determines weather protection and mounting bracket |
| Photo of the planned charger location | Mandatory photo showing the mounting wall and the parking bay in front of it | Missing photo |
| Cable route from the meter cabinet to the charger | Estimated length in metres, with customer confirmation that values were checked on site | Flags long cable runs before material is packed |
| Does the cable have to pass through walls or ceilings (e.g. basement to garage)? | Yes or no | Not a blocker on its own; tells the crew whether core drilling gear is needed |
| Photo of the open meter cabinet | Mandatory photo with the door open showing meters, fuses and free spaces | Missing photo |
| Is there free space in the meter cabinet for an additional meter or control device? | Yes, no, or “Don’t know” (the photo lets your team check) | No — a distribution board upgrade must be planned first |
| Planned charging power | 11 kW (grid registration), 22 kW (grid approval required), or “Don’t know” | Determines cable sizing and grid-operator lead time |
| Consent of landlord or owners’ association (if renting or in a condominium) | Not needed (own house), Yes, Requested / still open, or No | No — written consent is missing and the job cannot be booked |
How to stop crews rolling to unready EV sites
- Separate “Requested” from “Approved”: A tenant who has asked the landlord but does not yet have a yes is not ready for an installation slot.
- Check wall penetrations before packing the van: Knowing whether the cable crosses a basement ceiling avoids missing drills, seals and fire-stopping sleeves.
- Keep every photo and decision in one install pack: Hand the electrician one link or ZIP export on installation morning instead of forwarding WhatsApp threads.
Test how deterministic blocker rules protect your dispatch cutoff in our blockers before dispatch guide, or see our solar site survey checklist.
Frequently asked questions
- Does an EV charger pre-survey replace electrical load testing?
- No. Your qualified electrician still handles load assessment, earthing checks, protection selection and grid-operator notifications. The customer survey only confirms site conditions, photos and permissions ahead of the visit.
- What photos are essential before installing a home EV charger?
- Two photos cover almost every surprise: one of the exact wall and parking bay where the charger will sit, and one straight-on photo of the open meter cabinet or consumer unit.
- Can InstallCue chase customers who forget to upload their photos?
- Yes. When an email address is entered, InstallCue sends up to two automatic reminders ahead of your decision date, and no customer account or app download is required.
See how InstallCue checks site readiness · Plans and prices
Questions about features or using InstallCue?